K. W. METAL WORK PUBLIC COMPANY LIMITED Head office 259/83 Sukhumvit 71 road, Phrakhanong-nur, Wattana, Bangkok Branch 1 300/142 Moo. 1 Tambon Tarsit, Amohoe Pluag-daeng, Rayong Branch 2 300/138 Moo
Operating Company Hydrotek Plc. Project Type Waste Water Treatment Plant and Collection System Project Value THB 239 mn Progress (% of Completion) 28.26 % Commissioning Date October 2016 Construction Period 1
) (7.2) (682%) (8.2) (587%) Net Profit/(Loss) from the period attribute to equity holders of the Company (53.0) (4.9) (982%) (3.5) (1,414%) For the nine-month ended 30 September 2017 NPP Consolidated PL
(Asia) Public Company Limited (“the Company”) held on July 16, 2019, it was resolved that the Company enter into a connected transaction of the contact of land lease with factory building and office
Company; • All employees are required to wear a surgical mask at all times when in public areas; • Encourage employees to regularly wash their hands with water or alcohol and keep social distance; • The
69,351 Purchases of drinking water and bottled beverages. (Related parties of the Company served as major shareholders, directors, management, or controlling persons) Purchases of goods 229,088 390,392
situation is more severe than 2015, resulting in lower water level, as well as the rainfall that is lower than average which affects the agriculture and related industry sectors. However, the company has
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System