Project of State Railway of Thailand , etc. -2- The total operating expenses in 2021 increased from 2020 at a lower rate than the increased rate in revenue. Mostly because the project's gross margin in 2021
could accelerate operations. As a result, the company's revenue slightly lower than those in 2 0 2 1 , only decreased by 4. 4% . Most of the company's revenue recognized in 2022 such as the Project of
for the Ford dealership in Thailand ceased in October 2024. Cost of sales and services decreased in accordance with lower sales. Gross profit decreased by 36.0% from Baht 895.2 million in Q3 2023 to
revenue from Availability Payment (AP) of Sriracha Power Plant declined from lower seasonal Weight factor. In addition, Sriracha Power Plant and IRPC-CP had maintenance shutdown in Q4/2018. Management
revenue from Availability Payment (AP) of Sriracha Power Plant declined from lower seasonal Weight factor. In addition, Sriracha Power Plant and IRPC-CP had maintenance shutdown in Q4/2018. Management
this quarter being a part of the low season and has entered the rainy season resulted in floods in many areas; the impact of such event caused utilization of vehicles and fuel consumption to be lower
higher contribution from Integrated PET, Fibers and Packaging, off-set by production loss in Olefins and lower margin in Specialty Chemicals. Core EBITDA margin was 10% (-26 YoY: -12% QoQ). Core net
), benefitted from higher contribution from Integrated PET, Fibers and Packaging, off-set by production loss in Olefins and lower margin in Specialty Chemicals. Core EBITDA margin was 10% (-26% YoY: -12% QoQ
scheduled flights was 5,843.8 million baht, dropped by 4.1 percent from the same period last year. The declining of scheduled revenue was mainly from the lower passenger growth by 1.9 percent, together with a
scheduled flights was 5,843.8 million baht, dropped by 4.1 percent from the same period last year. The declining of scheduled revenue was mainly from the lower passenger growth by 1.9 percent, together with a