, chief executive officer or the next four executives succeeding the chief executive officer, the persons holding equivalent position to the fourth executive and shall include the persons holding the
Asia Sprint Holding Company Limited and Goldman Sachs Investments Holdings (Asia) Limited in 2 subsidiaries which were Pace Project One Co., Ltd. and Pace Project Three Co., Ltd. in 1Q2017. Accordingly
million Baht in 2018, which the subsidiaries company's operations are mainly supported by the holding company. The realized of AIL’s net loss in 2019 was the allowance for impairment amount of 1.62 million
holding (%) Installed Capacity (MW) Equity Capacity (MW) Commercial Operation Date Solar Rooftop Solar Private PPA 100% 24.4 24.4 1Q2020- 3Q2020 Total 24.4 24.4 OVERALL PERFORMANCE Operating Expense
of December 31, 2016 to Baht 80,710 million as of June 30, 2017, due to an increase in cash and cash equivalents, an increase in property, plant and equipment, and an increase in intangible assets
2016 2017 2018 Investment in jointly-controlled entity 700,000 700,000 700,000 Equipment 1,021,248 13,237,562 15,280,393 Intangible assets - 16,510 469,457 Deferred tax assets - 246,605 7,033,281 Other
jointly-controlled entity 700,000 700,000 700,000 Equipment 1,021,248 13,237,562 15,280,393 Intangible assets - 16,510 469,457 Deferred tax assets - 246,605 7,033,281 Other non-current assets - 2,495,158
700,000 700,000 700,000 Equipment 1,021,248 13,237,562 15,280,393 Intangible assets - 16,510 469,457 Deferred tax assets - 246,605 7,033,281 Other non-current assets - 2,495,158 8,997,822 Total non-current
8.6 MW Waste to Energy Power Plant, representing 2.9 Equity MW, is scheduled to achieve COD in 4Q2019. Power plant Type of power Category of producer Equity holding (%) Installed Capacity (MW) Equity
producer Equity holding (%) Contracted Capacity (MW) Equity Capacity (MW) Commercial Operation Date Gulf NLL2 Gas-fired Cogeneration SPP 25.01 120.0 30.0 Jan 2019 CCE Waste to Energy VSPP 33.33 6.9 2.3