tax income from BOI incentives that permit to carry forward losses (as in the early stage of first production line operation, company has annual losses) and deduct them as expenses for up to five years
Infrastructure and E&M Systems for the MRT Blue Line Project The Board of Directors’ Meeting No. 1/2018 of Bangkok Expressway and Metro Public Company Limited (the “Company”), held on February 27, 2018, has
Infrastructure and E&M Systems for the MRT Blue Line Project The Board of Directors’ Meeting No. 1/2018 of Bangkok Expressway and Metro Public Company Limited (the “Company”), held on February 27, 2018, has
Infrastructure and E&M Systems for the MRT Blue Line Project The Board of Directors’ Meeting No. 1/2018 of Bangkok Expressway and Metro Public Company Limited (the “Company”), held on February 27, 2018, has
provided by the company : Not exceeding Baht 19,000,000.- based on shareholding proportion in A Tech Textile Co., Ltd. (19% of total credit line of not exceeding Baht 100,000,000.-) When including credit
Baht 380,000,000.-, the total credit line provided by the Bank will be Baht 1,080,000,000.- Guarantee amount provided by the company : Baht 30,800,000.- based on shareholding proportion in Sahapat Real
.-, the total credit line provided by Wacoal International Hong Kong Co., Ltd. will be USD 5,600,000.- converted in Thai currency not exceeding Baht 185,000,000.- Guarantee amount provided by the company
result from the company increased its flexible packaging production line since Q2/2017, in Q1/2017 the revenue from flexible packaging had not yet recognized. For other income, the company had other income
Limited (Oishi Trading), a subsidiary of the Company, in the Sale of Drinking Water Production Line 1 to BevTech Co., Ltd. These transactions are considered as connected transaction with the details as
1 / 2 IR.011/2019 14 May 2019 Re: Notification of the changes of the Profit and Loss Statement To President The Stock Exchange of Thailand T Engineering Corporation Public Company Limited (the