to 28% 2016 2017 % change million Baht million Baht y-on-y Sales and service income 27,747 31,482 13.5% EBITDA 7,494 8,725 16.4% Net profit 2,316 3,594 55.2% Normalized net profit (NNP)* 2,090 2,918
debt to equity ratio from 1.6x to 1.0x as of December 31,2019. Projects under construction are on track LK Solar Floating in Thailand, with an installed capacity of 13 MW had 16.3% current construction
practices regularly monitored and reported. Projects under construction are on track Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW has 98.9% construction progress. The
ตอนการตรวจกระดาษทำการของผู้สอบบัญชีที่สังกัดสำนักงานสอบบัญชีที่มีระบบควบคุมคุณภาพในระดับดีถึงดีมาก (ระบบ fast track) ทำให้สามารถพิจารณาให้ความเห็นชอบผู้สอบบัญชีได้รวดเร็วขึ้นมาก จากเดิมที่ใช้เวลาไม่เกิน
enhanced to 28% 9M'2016 9M'2017 % change million Baht million Baht y-on-y Sales and service income 20,691 23,720 14.6% EBITDA 5,679 6,626 16.7% Net profit 2,473 2,823 14.1% Normalized net profit (NNP)* 1,966
วันที่ 15 ตุลาคม 2545 1 NO. (SUTHA-SET) 016/2019/EN 14 August 2019 Subject : Clarification of Q2/2019 the total revenues and the Net profit change more than 20% To : The President of the Stock
on track Interchem, the waste-to-energy project, with an installed capacity of 4.8 MW had 86.64% current construction progress which is on process of drainage system piping, double layer brick wall and
with sustainable growth. Projects under construction are on track Interchem, the waste-to-energy project, with an installed capacity of 4.8 MW had 50.7% current construction progress which is on process
17,795.02 million, representing 92.42% of total revenues, a decrease of 19.79% or Baht 4,390.43 million from last year. The revenue dropped because Jira-Khon Kaen Double-Track Railway Project has been