Significant Event Focus on Developing and Expanding Luggaw and Mikka café The Company plans to open an additional 5 “Luggaw” branches during 2H/2024. In Q2/2024, the Company expanded 4 new Luggaw café, located
Company Limited (BIC) Phase 2 is a gas-fired SPP Cogeneration, located in Bangpa-In Industrial Estate, Phra Nakhon Si Ayutthaya Province, with capacity of 117 megawatts of electricity and 20 tonnes per hour
% ownership interest.), is a cogeneration power plant project. The power plant has an installed capacity of 121 MW. The project is located in Klongnueng sub-district, Klonglaung district, Pathumthani province
operation in various development projects regarding architecture, every branches of engineering which are civil engineering, structural engineering, transportation engineering, hydraulic engineering
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
project with 358 units and living space from 141-165 sq.m. per unit. The total project value is more than THB 1,000 mn and is located next to Centralplaza Phitsanulok, distinguished with the green area
construction, as detailed below: One combined cycle power plant, which is currently in operation, located at Si Racha District, Chon Buri Province. Cogeneration power plants with steam production unit
consideration for the assets acquired Value of the Company’s securities paid-up shares None Ref. WINNER 0009/20108 Page 5 of 8 Factory is located in Muang district, Chachoengsao province and authorized