following businesses: (a) rail or pipe transportation system; (b) electricity; (c) water supply; (d) road, toll road or concession road; (e) airport; (f) deep sea port; (g) telecommunication or information
contractors who were affected by the floods. The Company continuously attempts to accelerate the installation afterward, however, the project still remains incomplete until now which is beyond the extended due
documents in full according to the procedures specified in the Licensing Manual. Remarks: ** If the application or evidentiary documentation is incorrect or incomplete and cannot be fixed or filled up at the
affected by the floods. The Company continuously attempts to accelerate the installation afterward, however, the project still remains incomplete until now which is beyond the extended due date already
. Bhusana and Marupong had signed in acceptance of the complete construction and approved the full payment when in fact the construction was incomplete. Case 8: Committing a fraud by misappropriating money
. Page 11 - On September 25, 2019, EGCO has entered into the Shareholder’s Agreement of Thai Pipeline Network Company Limited (TPN) to acquired 44.60% ownership interest. TPN operates oil transportation
takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to the
takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to the
Rajchapluek Engineering Company Limited Non-Destructive Testing and Inspection services Paid-up Capital 20 Mil.Baht TAKUNI holds 99.99% G Gas Logistics Company Limited Transportation Service Paid-up Capital 15
Equipment Transportation Service Paid-up Capital 15 Mil.Baht TAKUNI holds 99.99% Takuni (Thailand) Company Limited LPG/CNG conversion kit installation and LPG system construction Paid-up Capital 50 Mil.Baht