วันที่ 14 สิงหาคม 2550 DEMCO Public Company Limited No. Demco AC001/2020 February 28, 2020 Subject : The company’s operating result for the year 2019 To : The president, The Stock Exchange of
construction design. Many projects are gradually completed. Concurrently, many new projects that have been signed into contract or about to be signed which will allow the Company to begin to recognize revenue
Factory - Property of Assets : Current in the design process 1.4.2 Future Business Plan After entering into the transaction, the Company shall construct a factory building and install machinery; a steel
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
into the health and beauty business in the capacity of original equipment manufacturer (OEM) and original design manufacturer (ODM). MORE added that the company is currently studying investment
. (Nonthaburi); Fortune Parts Industry Plc., Eureka Design Plc. (Pathum Thani); Energy Absolute Plc. (Prachin Buri); East Coast Furnitech Plc. (Rayong); Golden Lime Plc. (Lopburi); Chularat Hospital Plc
วันที่ 14 สิงหาคม 2550 DEMCO Public Company Limited No. DEMCO 019/2017 August 11, 2017 Subject : The company’s operating result of the 2nd quaternary for the year 2017. To : The president, The Stock
DEMCO 012 operating result Q 3-60 E DEMCO Public Company Limited No. Demco 023/2017 November 14, 2017 Subject : The company’s operating result of the 3rd quaternary for the year 2017. To : The