) Company Limited (GEP) operates solar power plant project with installation capacity 220 MW at Minbu District, Myanmar. ECF-P holds 20 percent of total shares of GEP. Currently, the project is under
amounted to Baht 3.62 million. 2. Green Earth Power (Thailand) Company Limited operates solar power plant project with installation capacity 220 MW at Minbu District, Myanmar. ECF-P holds 20 percent of total
solar power plant project in Myanmar (Green Earth Power (Thailand) Co.,Ltd.) increased and not yet been started the commercial operation. However this project is expected to be started the commercial
. From the power plant business in the amount Baht 19.04 million. The main reason is that the solar business has adjusted the unrealized exchange rate loss of foreign currency. Financial cost For the six
าคญั โดยก าไรสุทธิจ านวน 43.5 ลา้นบาท ลดลงร้อยละ 89.8 จากไตรมาส 1 ปี 2562 เหตุการณ์ส าคญัในไตรมาส 1 ปี 2563 โครงการโรงไฟฟ้าพลงังานแสงอาทิตย ์(Solar Rooftop) มีการเซ็นสัญญาใหม่จ านวน 6.5 เมกะวตัตใ์น
) and IGEN Energy Company Limited has long term loans from financial institution of 25.03 Million Baht thus Solar Rooftop and recognize provisions for compensation and dismissal of employees of 13.86
Amata B.Grimm Power (Rayong) 2 ABPR3 Amata B.Grimm Power (Rayong) 3 ABPR4 Amata B.Grimm Power (Rayong) 4 ABPR5 Amata B.Grimm Power (Rayong) 5 BGPSK B.Grimm Solar Power (Sakaeo) 1 BGSENA B.Grimm Sena Solar
commercial operation of Mount Emerald Wind Farm Project and Collinsville Solar Power Project on December 12, 2018 and March 21, 2019, respectively. 2.2 Finance costs Finance costs for the 2 nd quarter of 2019
Mount Emerald Wind Farm Project and Collinsville Solar Power Project; projects under RATCH-Australia Corporation Limited, a subsidiary located in Australia, increased in the total amount of AUD 151.03
when combined with the acquisition of assets in the period of 6 months occurred before the date of the BOD has approved the acquisition of the WPS is the acquisition of Solar Power Projects with capacity