Branch in Phnom Penh In October 2024, the Company opened its first After You dessert Café in Cambodia, located in Phnom Penh, which was well-received by customers. The Company continues to seek for new
% ownership interest.), is a hydro power plant project, Run-of-River, with the capacity of 1,285 MW. The project is located on the Mekong River in Xayaburi Province of the Laos People’s Democratic Republic
Company Limited (BIC) Phase 2 is a gas-fired SPP Cogeneration, located in Bangpa-In Industrial Estate, Phra Nakhon Si Ayutthaya Province, with capacity of 117 megawatts of electricity and 20 tonnes per hour
% ownership interest.), is a cogeneration power plant project. The power plant has an installed capacity of 121 MW. The project is located in Klongnueng sub-district, Klonglaung district, Pathumthani province
percent as calculated based on the total value of consideration criterion, which gives the highest transaction value (the “Disposal Transaction”): (1) 16 plots of vacant land located on Charan Sanit Wong
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
instead as well as enhanced its sales channels. The Company could well organized the inventory management, the inventory at the end of the year equal to 1,329 million baht, decrease by 677 million baht or
าหน่ายหลกัทรัพยเ์ป็นผูจ้ดัสรรใหบ้ริษทัและลูกคา้ แยกจากกนั (2.2) มีการก าหนดวิธีการและขั้นตอนท่ีจะท าใหก้ารซ้ือขายหลกัทรัพยเ์ดียวกนั ของลูกคา้และของบริษทัในตลาดรอง (organized secondary market) มีความ