financial institutions. A summary of the key operational matters and events for the 1st Quarter 2018 GFPT Group had total revenue from sales of THB 3,958.50 million in 1Q2018, representing a decrease of THB
land with a building worth 125 million baht to expand its production area, warehouse and delivery. The building is still in the process of preparing for readiness to use in the next phase. 2.1.4
in power business to extend power and utility production that use different type of fuels. The company will recognize the income in the future after the construction is completed, which will stabilize
Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical
from product sales in total of THB 9.87 million, a decrease of THB 25.18 million or 71.84% from the same period of previous year due to there was no production since 2017 to reduce cost of managing
equivalent to Baht 3.80 million. Riau Combined-Cycle Power Plant Project is located in the Republic of Indonesia, with the production capacity of 275 megawatts and 20-year Power Purchase Agreement. The
, following the gradual economic growth and the export sector has expanded well from the economic recovery. Beside, company and its subsidiaries recorded the profit sharing to non-controlling interest in a
, there were some investment in machine and equipment to expand the production capacities. 2.1.4 Restricted fix deposit: As at 31st Dec 2017 and 31st March 2017, the Company and its subsidiaries had the net
Year Ended December 31, 2017 Page 1 (Translation) 1. Significant events of the year 2017 1.1 The Progress of Projects 1.1.1 Collinsville Solar Power Project in Australia ("The Project") On May 5, 2017
production in the first half of 2017. Cost of goods for year 2017 was 67.38% of revenue when compared with same period last year was 65.39%, thus year 2016. (2) Revenue from Property Development Business