-current asset of THB 900 million (mostly from Methyl Ester project plant 2) but there was depreciation of non- current assets of THB 499 million. Liabilities As of December 31, 2017, the company had total
its plan for the project at soi Sukhumvit 19 from developing a condominium to develop a 4 stars hotel. The current progress is on design stage and choosing hotel brand operator. The Company targets to
market share in the economic slowdown. When comparing the sale volume to the same period in 2018, decreased 0.9%. The company is not able to increase the selling price in the current economic conditions
is not able to increase the selling price in the current economic conditions. The company has a higher gross margin comparing to the same period from 10 .4 % to 15 .5 % because the lower cost of the
March 31, 2020 were 1,594.8 million baht, increased 27.8 million baht or 1.8 percent compared to the total assets as of December 31, 2019. (1.1) Current Assets As of March 31,2020 current assets amounted
auditor, are as follows: Statement of Financial Position (Baht) Liabilities and shareholders’ equity Liabilities Trade and other current payables 65,975.77 Total current liabilities 65,975.77 Long-term
follows: Statement of Financial Position (Baht) Liabilities and shareholders’ equity Liabilities Items 31 December 2016 Assets Cash and cash equivalents 198,674.01 Other current assets 36,995.84 Total
follows: Statement of Financial Position (Baht) Liabilities and shareholders’ equity Liabilities Trade and other current payables 65,975.77 Total current liabilities 65,975.77 Long-term borrowings
million or 1% from 31 December 2019 which was primarily as a result of the following: • Current assets: increased by THB 1,847 million or 5% mainly due to (i) a decrease in cash and cash equivalent of THB
financing activities in respect of each financial year required to be included in the registration statement and, if interim cash flow statement has been included in the registration statement, the period