% ownership interest.), is a hydro power plant project, Run-of-River, with the capacity of 1,285 MW. The project is located on the Mekong River in Xayaburi Province of the Laos People’s Democratic Republic
Company Limited (BIC) Phase 2 is a gas-fired SPP Cogeneration, located in Bangpa-In Industrial Estate, Phra Nakhon Si Ayutthaya Province, with capacity of 117 megawatts of electricity and 20 tonnes per hour
% ownership interest.), is a cogeneration power plant project. The power plant has an installed capacity of 121 MW. The project is located in Klongnueng sub-district, Klonglaung district, Pathumthani province
paying distribution to unitholders at an amount not less than 90% of the adjusted net profit of the fiscal year within 90 days as from the end of the fiscal year or the accounting period when the payment
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
having the income derived from the operation of the assets under (a) (b) (c) or (d) not less than seventy five percent of the company’s total income in each fiscal year; and 2. having its shares held by a
having the income derived from the operation of the assets under (a) (b) (c) or (d) not less than seventy five percent of the company’s total income in each fiscal year; and 2. having its shares held by a
value or having the income derived from the operation of the assets under (a) (b) (c) or (d) not less than seventy five percent of the company’s total income in each fiscal year; and 2. having its shares