Khlong Khlung District, Kamphaeng Phet Province with total installed capacity of 20 MW and 13.31 MW Power Purchase Agreement (PPA) under Feed-in Tariff (FiT) scheme for 20 years from its COD with the
District, Kamphaeng Phet Province with total installed capacity of 20 MW and 13.31 MW Power Purchase Agreement (PPA) under Feed-in Tariff (FiT) scheme for 20 years from its COD with the Electricity
segment was adversely impacted in 2018 due to the acquisitions of mothballed capacities in EMEA (Egypt, Portugal) and FM/shutdown in the Netherlands and Poland. These will contribute to their full capacity
the measure to increase Cracking to CDU capacity ratio was enforced since the 1st of April, 2017, leading to lowered supplies. Moreover, Russian refineries were upgrading capacity since 2016, lowering
the effective capacity for power generation in the power plants which have already commenced commercial operation, separated into electricity generation of approximately 1,530 MW, steam of approximately
at that level for 20 days before returning to normal capacity. The difference between Dated Brent and Dubai price average in Q2/2018 compared to Q2/2017 increased by 2.37 $/BBL was due to more Asian
would like to invest in production and distribution of water supply to some part of Phuket and Phang-Nga project with the maximum capacity 96,000 Cubic metre per day (divided into 4 pharses, each pharse
in production and distribution of water supply to some part of Phuket and Phang-Nga project with the maximum capacity 96,000 Cubic metre per day (divided into 4 pharses, each pharse has capacity 24,000
capital increase is to expand the capacity of flexible packaging products, to repay the loans and used as working capital. Details are shown in Capital Increase Report Form (F 53-4) (Attachment 1). 4
capital increase is to expand the capacity of flexible packaging products, to repay the loans and used as working capital. Details are shown in Capital Increase Report Form (F 53-4) (Attachment 1). 4