), a subsidiary of GPSC, to design and install the floating solar. The electricity generated in the initial phase will be used by office buildings and will be a model for further research and development
and service income 11.8 13.8 2.0 16.9% Sales from Municipal Solid Waste Power Plants 114.0 126.4 12.4 10.9% Sales of electricity - Base tariff and Ft 5.3 5.0 (0.3) (5.7%) Sales from Solar Energy Power
lender, for a debt facility of AUD 179 million to use in the construction and development of the Collector Wind Farm, with capacity of 226.8 megawatts, located in New South Wales, the Commonwealth of
: Solar Rooftop had signed new contract of 6.5 MW in 1Q2020, total accumulated signed contract as of 1Q2020 were 36.9 MW and had started COD of 9.7 MW in 1Q2020, total operating of 16.1 MW as of 1Q2020
Date (COD) of two phases in November 2017 and Ichinoseki Solar Power 1 GK (ISP1) started in December 2017. The share of profits of associates and joint ventures in 2018 also increased by Baht 78 million
Date (COD) of two phases in November 2017 and Ichinoseki Solar Power 1 GK (ISP1) started in December 2017. The share of profits of associates and joint ventures in 2018 also increased by Baht 78 million
solar cell implementation service from Combine Heat and Power Producing Company Limited (CHPP) as well as the increase in maintenance cost leading to a fall in gross profit. The gross profit of the
biomass power plants which increased by Baht 111.0 million as the result from successfully achieved Commercial Operation Date (COD) of Khlong Khlung SPP Hybrid Power Plant (Biomass and Solar Rooftop) in
million or 1% from Q3/2017, as a result of the Commercial Operation Date (COD) of IRPC-CP Phase 2 and Ichinoseki Solar Power 1 GK (ISP1) in Q4/2017 even though the selling and administrative expenses
million mainly due to the decreased in revenue from Combine Heat and Power Producing Company Limited (CHPP) by Baht 19 million as a result of the lower revenue from solar cell implementation; despite the