hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the PPA with EGAT with the contracted capacity of 1,220 MW
(Run of the river) with an installed capacity of 15 MW have 97.3% construction progress. The COD schedule has been shifted slightly from December 1, 2018 to 1H’2019 due to longer time for Lao PDR’s
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
year. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW has 87.6% construction progress targeted to commence COD on December 1, 2018. ABBREVIATION & OUR PROJECTSFINANCIAL
and target to commence COD and record revenue in December 2018. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW have 92.6% construction progress. The COD schedule has
Duong River Surface Water Plant JSC เม่ือวนัท่ี 7 สิงหาคม 2562 โดยมีมูลค่าซ้ือขายรวม 2,073.2 พนัลา้นดองเวียดนาม (หรือประมาณ 2,763.0 ลา้นบาท) ท่ีอตัราแลกเปล่ียน 0.0013 บาทต่อดองเวียดนาม อา้งอิงอตัราแลก
% ownership interest.), is a hydro power plant project, Run-of-River, with the capacity of 1,285 MW. The project is located on the Mekong River in Xayaburi Province of the Laos People’s Democratic Republic
Xayaburi Power Company Limited, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The
Project Type of Fuel Hydro (Run of the river) Installed Capacity 15 MW Economic Ownership 72.0% SCOD Q4’2018 EDL PPA 15.0 MW / 25 years % Progress 61.2% Progress on track B.GRIMM POWER PUBLIC COMPANY
(Xayaburi), (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the