) / specific period as stated in each PPA with IU Seller BGPR1 BGPR2 ABP1R ABP2R BPLC1R BPAM Province Ang Thong Chonburi Rayong Estimated total installed power capacity per project 140 megawatts (where 90
IRPC Clean Power Company Limited (IRPC-CP) is a Small Power Producer (SPP) with total installed capacity of 240 Megawatt of electricity and 180-300 Tons per hour of steam, in which GPSC had hold the
policy is no less than 40% of Normalized net profit (NNP). Progress of projects under construction Ray Power, solar project in Cambodia, with an installed capacity of 39 MW had 35.9% construction progress
into 122,000 kiosks and usage amount into Bt32,000mn within 2017. The Company has installed 10,541 kiosks, resulting in the total of 110,563 kiosks. The Company expands point of service to cover all
into 122,000 kiosks and usage amount into Bt32,000mn within 2017. The Company has installed 8,603 kiosks, resulting in the total of 119,166 kiosks. The Company expands point of service to cover all areas
into 122,000 kiosks and usage amount into Bt32,000mn within 2017. The Company has installed 8,603 kiosks, resulting in the total of 119,166 kiosks. The Company expands point of service to cover all areas
were acquired in late of 2018 and machines that installed in 2nd Factory and were ready to use in second half of 2018 such as screw flight machine and powder booth system machine. 3. Finance costs
was in the amount of 18.61 million baht, increased by 2.63 million baht or 16.45% from the same period of 2017. The increased mainly came from depreciation expenses from machines that installed in 2nd
installed for prompt usage. - The proposal of machine purchasing cost per one machine is 10,000,000 Baht, therefore, in total of 2 machines is 20,000,000 Baht. And one Knife grinding machine is 250,000 Baht
foreign currency exchange rate in the period. During 3Q19, production increased as new machines were installed, which resulted in an increase in production capacity of special grade PCBs (Table 5). In