plant project with the installed capacity of 220 MW at Minbu District, Myanmar that ECF Power Company Limited (ECF-P) as the Company’s subsidiary holds 20 percent of total shares of GEP. At present, the
cogeneration power plant project. The power plant has an installed capacity of 121 MW. The project is located in Klongnueng sub-district, Klonglaung district, Pathumthani province. The project has entered into
installed in the past year. However, the main variable costs including raw materials and consumables used decreased from the previous year as the production slowed down. The only selling and administrative
agreement for constructing the plant. Machines and equipment for the plant also have been ordered from suppliers. The plant will be complete in Q4/2018 and all machines an equipment will be installed. The
seller of electricity from solar power with a total installed capacity of 5 MW and sells it to the Provincial Electricity Authority since 15 October 2012. a. General Information of RPV Company’s name : RPV
, there were commencement of commercial operation of the government solar projects in collaboration with the War Veteran Organization (WVO) and Solar rooftop project (Total installed capacity 9.69 MW). For
and Share of Profit to WHAUP. WHAUP is a strategic co-developer of power business. We currently have total installed capacities of 556 equity MW under operation, and another 23 equity MW under
) / specific period as stated in each PPA with IU Seller BGPR1 BGPR2 ABP1R ABP2R BPLC1R BPAM Province Ang Thong Chonburi Rayong Estimated total installed power capacity per project 140 megawatts (where 90
operational staff. Additionally, in July, the Ministry of Finance approved the establishment of GPSC Treasury Center Company Limited (GPSC TC), a 100% owned subsidiary of GPSC set up to increase efficiency and
there were provision for assets of subsidiaries set up in 2018 amounting to Baht 28.9 million and reversed loss of impairment of land amounting to Baht 16.2 million. No significant change in