million Baht compared to 38.67 million Baht and 38.41 million Baht respectively in the quarter 2/2016 due to the major reasons as follows; 1. Incomes from the production and installation of the pipeline
install due to heavy rain and flooding. Make delivery and installation delayed. In the fourth quarter of 2017, the Company has installed and delivered to the customers for installation and remaining 11
for repayment from 1 year to 2 years at the original interest rate and the condition to the withdraw the was comfortable 6 8. Opinions of the Audit Committee and/or the Directors of the Company having
for repayment from 1 year to 2 years at the original interest rate and the condition to the withdraw was comfortable 6 7. Opinions of the Audit Committee and/or the Directors of the Company having
operations of the Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate
in distribution of product and equipment, design, assembly and installation and maintenance service of pure water treatment system; as well as dialysis service of clinic business for kidney patients
of the Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate
year 2016 ECF Holdings Company Limited, as the subsidiary of the Company by holding 75 percent of total shares, invested to solar power plant with installation capacity 1.5 MW at Himeji Prefecture, Japan
biomass power plant project with installation capacity 7.5 MW of Prize of Wood Green Energy in Narathiwat Province which this project is held 99.99 percent of tota l shares by SAFE. The Company could start
power plant project with installation capacity 7.5 MW of Prize of Wood Green Energy in Narathiwat Province which this project is held 99.99 percent of total shares by SAFE. The Company could start gaining