% ownership interest.), is a hydro power plant project, Run-of-River, with the capacity of 1,285 MW. The project is located on the Mekong River in Xayaburi Province of the Laos People’s Democratic Republic
Company Limited (BIC) Phase 2 is a gas-fired SPP Cogeneration, located in Bangpa-In Industrial Estate, Phra Nakhon Si Ayutthaya Province, with capacity of 117 megawatts of electricity and 20 tonnes per hour
% ownership interest.), is a cogeneration power plant project. The power plant has an installed capacity of 121 MW. The project is located in Klongnueng sub-district, Klonglaung district, Pathumthani province
higher by 34% QoQ due to entry in to India. The Hygiene business is relatively secure as IVL has already positioned for local supplies. Hygiene business volumes are higher by 62% YoY primarily by our entry
. In 2019, we expect raw material supply and price to normalize from the existing high levels due to weaker crude oil environment and ample paraxylene and MEG supply additions. IVL is well positioned
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
project with 358 units and living space from 141-165 sq.m. per unit. The total project value is more than THB 1,000 mn and is located next to Centralplaza Phitsanulok, distinguished with the green area
consideration for the assets acquired Value of the Company’s securities paid-up shares None Ref. WINNER 0009/20108 Page 5 of 8 Factory is located in Muang district, Chachoengsao province and authorized