duties to design, supply, install, test the M&E Equipment, and trial run, as well as to provide the O&M services for the civil infrastructure (except for the park and ride building) and M&E Systems, which
Rapid Transit Authority of Thailand (“MRTA”) under the MRT Blue Line Concession Agreement on March 31, 2017, under which the Company has the duties to design, supply, install, test the M&E Equipment, and
duties to design, supply, install, test the M&E Equipment, and trial run, as well as to provide the O&M services for the civil infrastructure (except for the park and ride building) and M&E Systems, which
- Sales and service of water supply 138.99 97.73 42.22 - Installation of water production systems and construction of turnkey water treatment systems 46.96 102.71 (54.28) WIIK PUBLIC
supply due to low Biodiesel production in Indonesia. 2. In Q2 2017, Selling and Administrative Expenses was 339 MB, increased by 54 MB or 19.1% comparing to 2016 due to related expenses of the transitional
designated as the operator of the instant and semi-instant food manufacturing and distribution business as well as the supply, manufacturing and distribution of raw materials and food ingredients to various
affiliated to subsidiary company of Ramkhamhaeng since August, 2018. 1.2 Ramkhamhaeng has revenue from selling medical supply and equipment 490.07 million baht, which increase 82.99 million baht from the
sugar supply surplus in 2018 which still affects current price, now trade around 12 - 13 cent/lb. As a result, the Company recorded a decrease in average sugar price from the previous year but the Company
sugar supply surplus in 2018 which still affects current price, now trade around 12 - 13 cent/lb. As a result, the Company recorded a decrease in average sugar price from the previous year. Therefore the
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System