under its 50-year concession with the total generating capacity of 48,000 cubic meters per day. The generating capacity is divided into 2 phases; Phase 1 commenced its operation in December 2018 at 24,000
expects to have aggressive growth in 2018, according to the Company’s 9- year strategic business plan (2015 - 2023) which is divided into 3 periods of 3 years each. During the first phase of the strategic
throughout 2020 as the pandemic impact arose since beginning of the year and the new phase of outbreak re-emerged in late 4Q. Mobile business had been pressured by sluggish economy amidst market competition
ทนุในงาน โครงการขนาดใหญ่หลายโครงการ เช่น โครงการซือ้และติดตัง้ระบบคลาวดข์อง กสท.โทรคมนาคม โครงการจา้งงานดา้น เทคโนโลยีสารสนเทศและการสื่อสารอาคารรฐัสภาแห่งใหม่ ทัง้ Phase I และ Phase โครงการขายพรอ้มติด
or 15% from 2017 because Bangpa-In Cogeneration Company Limited Phase 2 (BIC2) had started COD in June 2017 and higher income from the concession according to TFRIC12 of Nam Lik 1 Power Company Limited
or 15% from 2017 because Bangpa-In Cogeneration Company Limited Phase 2 (BIC2) had started COD in June 2017 and higher income from the concession according to TFRIC12 of Nam Lik 1 Power Company Limited
operation and is not based on inside information. The survey result is as of the date appearing in the Corporate Governance Report of Thai Listed Companies. As a result, the survey result may be
affected the total marketing margin, and the increasing investment in Non-Oil businesses; which is in the developing phase of its infrastructure and location expansion, thus incurring high Selling, General
international airports (Suvarnabhumi – Don Muang – U-Tapao), Laem Chabang Port Phase III, Map Ta Phut Industrial Port Phase III, Sattahip Commercial Port, and the connection of railway networks with the three
890 854 9% -4% 2,327 2,542 9% Electricity Sales (Million kWh) Solar Power Business – Thailand Phase 1-3 (130 MW) 61.01 62.67 60.69 -1% -3% 191.38 186.70 -2% Cooperative Solar Project (12 MW) N/A 5.40