of rain-storage system, purifying machine by UV for water in manufacturing process, and water system installation and water treatment project, etc. Despite of revenue from projects decreased, revenue
base area 916.63 square meters for water storage located Moo.5 Mai Khao District, ampher Talang, Phuket Province. Currently it will valid until June 14, 2018 and GS will renew the license until
storage plan in order to be sufficient for production in a longer period. Restricted deposits at financial institutions decreased by Baht 188.9 million, which are deposits with financial institutions as
subsidiaries had revenue from Other Income in the 2nd quarter of 2018 and 2017 for THB 2.12 million and THB 4.27 million, which consist of storage tanks rental, sales of scrap materials, interest income, gain on
. Other income The Company and its subsidiaries had revenue from Other Income in the 3rd quarter of 2018 and 2017 for THB 2.28 million and THB 4.43 million, which consist of storage tanks rental, sales of
interest). The project connects the Thai Petroleum Pipeline Co., Ltd (Thappline) Terminal in Saraburi to TPN's owned terminal with storage capacity of 142 million liters in Khon Kaen, through a newly
) to maintain the water level in the reservoirs above the dead storage level EASTERN WATER RESOURCES DEVELOPMENT AND MANAGEMENT PUBLIC COMPANY LIMITED MANAGEMENT DISCUSSION AND ANALYSIS FOR Q2/2020 3 3
Limited (TPN) (EGCO holds a 44.60% ownership interest). The project connects the Thai Petroleum Pipeline Co., Ltd (Thappline) Terminal in Saraburi to TPN's owned terminal with storage capacity of 142
to not exceed 600,000 cubic meter per day (CMD) to maintain the water level in the reservoirs above the dead storage 3. Transfer water from Prasae Reservoir to Nongplalai and Klongyai Reservoirs
., Ltd (Thappline) Terminal in Saraburi to TPN's owned terminal with storage capacity of 142 million liters in Khon Kaen, through a newly constructed 342.80 kilometers undergrounded pipeline which has an