are engineering, construction,and installation of electrical and control systems. The Company has also been providing operation and maintenance services to offshore and onshore https://market.sec.or.th
. Currently, the construction of the factory building, and machine installation has been partially completed. Anywise, the company had to repay loans and interest regularly. 7. The performance of the company
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
installation capacity 7.5 MW of Prize of Wood Green Energy at Narathiwas Province which this project is held 99.99 percent of total shares by SAFE. The Company could gain profit sharing from the 1st Quarter 2018
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Installation of Cloud Project to support the service of the central government cloud of CAT Telecom Plc., The High-Speed Internet Service Project in Remote Area, The D-Ticket Project of State Railway of Thailand
labor’s cost at the initial stage for training and development of the employee’s skill resulting the high manufacturing cost at the initial stage. If the Company reach the Optimum Level and the installation
to be continuously trained and developed their skills. This resulted in the production cost in the first period remained high. When reaching the optimum level and the installation of some machines is
product. Moreover, the company’s factory area is not enough for the installation of the new machinery, therefore, it is necessary to choose the location of the factory building and the office that made this
period last year, which was driven by SSSG of 6.8% in our hardline retailing in Thailand category, and the introduction of new merchandise and the installation of in-store amenities such as air