- 2019 Balance by Quarter Change Q2–19 Q1–19 Q2–18 Q2–19 VS Q1–19 Q2–19 VS Q2–18 (Million Baht: MB) (MB) % (MB) % Total Revenue 1,730.1 1,266.8 1,029.9 463.3 36.6 700.2 68.0 Total Operating Expenses
proceeds of total THB 80-100 mn 3.) To invest in the Central Wastewater Treatment Plant and Collecting System of the industrial Zone of Mandalay project which the detail is in following table: Project Name
industrial Zone of Mandalay project which the detail is in following table: Project Name Central Wastewater Treatment Plant and Collecting System of the industrial Zone of Mandalay (“CWTP”) Concessionaire
industrial Zone of Mandalay project which the detail is in following table: Project Name Central Wastewater Treatment Plant and Collecting System of the industrial Zone of Mandalay (“CWTP”) Concessionaire
Summary of operations and the factors that make a significant change Summary of Operations for the Year 2018 Topic Annual Balance Change 2018 2017 2018 VS 2017 (MB) (MB) % Total Revenue 4,237.6 5,397.2
Summary of operations and the factors that make a significant change Summary of Operations for the Year 2017 Topic Annual Balance Change 2017 2016 2017 VS 2016 (MB) (MB) % Total Revenue 5,397.2 4,419.1
Summary of operations and the factors that make a significant change Summary of Operations for the Year 2017 Topic Annual Balance Change 2017 2016 2017 VS 2016 (MB) (MB) % Total Revenue 5,397.2 4,419.1
Mn % (1) THB Mn % (1) Revenue from Sales and Service 708.4 94.0% 739.4 96.6% Franchise Fees Income 21.0 2.8% 17.3 2.3% Other Income 23.9 3.2% 8.5 1.1% Total Revenue 753.3 100.0% 765.2 100.0% Revenues 6
2018 Q3 2019 Increase/ (Decrease) 9M 2018 9M 2019 Increase/ (Decrease) THB mm THB mm % THB mm THB mm % Total Revenue/1 1,756.9 2,244.3 27.7% 7,227.4 9,121.4 26.2% Total Cost 492.6 916.3 86.0% 2,880.8
-border gateway for other e-wallets. Revenue continued pressured by unlimited plans Mobile revenue in 3Q18 remained softened from the customer’s subscription of fixed-speed unlimited plans, resulting in