Laboratories Co., Ltd. is a listed company established in the year 1971. The manufacture and distribution of conventional medicine. Office and Factory are located at No.47 Soi Boonchana, Sukhumvit 59, Klong Ton
plot of land of title deed No. 1641 which located at Bueng Kamproy Sub-district (The south Khlong Hok Wha Canal), Lum Lukka District (Minburi), Patum Tani Province in the price of Baht 35 million (at the
. General characteristics and details of Related Parties Transaction 3.1 The leased property is a 6-floor office building used as head office and located on Rama 9 Soi 13, Rama 9 Road, Bang Kapi, Huai Khwang
Woodsmith Company Limited is located at 8/3, Moo 8, Tambol Thakam, Ampor Bang Pakong, Chachoengsao province. The contract is for one year - starting from 1 July 2020 to 30 June 2021. 4. The total value of the
), a project of Paju Energy Services Co.,Ltd. (Paju ES) (EGCO holds a 49.00% ownership interest), located in Gangdong-gu, Seoul, South Korea with a capacity of 19.80 MW. Gangdong will sell electricity to
in 2017. The project is located on Thetsaban 9 Road (opposite Sattahip Temple), Sattahip District, Chonburi Province. The total project value is 99.62 million baht. Currently, the project value
industrial waste to energy power plant project located at Ratchaburi Industrial Estate and operated by Progress Interchem (Thailand) Co., Ltd. (“Interchem”) with a contracted capacity of 4.0 MW (an installed
equivalent to Baht 3.80 million. Riau Combined-Cycle Power Plant Project is located in the Republic of Indonesia, with the production capacity of 275 megawatts and 20-year Power Purchase Agreement. The
Power Project 2 1. EXECUTIVE SUMMARY 1.1) Significant events Commercial operation of XXHP XXHP – the two hydro power projects located in Champasak province in the Lao People’s Democratic Republic - has an
and proposed to the shareholders’ meeting to approve a termination of leasehold rights on land under the title deeds no. 435 and 2847 located on Onnut–Ladkrabang Road,Ladkrabang Sub-district, Ladkrabang