3,130,000 17.75 4. Mr. Thanarat Possawong 2,500,000 14.18 Total 17,630,000 100.00 At present, The Megawatt Company Limited has a plan to invest in the solar power plant with the installed capacity of 360 MWp
solar panels in area of the transmission towers, which is a new business. 1.6 Other income of 2.65 million baht, a decrease of 8.47 million baht or 76.19 percent due to the same period of the previous
main facilities have already finished and on process of transmission line and communication system. The target COD is in 1H’2019. DTE1&2 solar project (Xuan Cau Project) with an installed capacity of 420
rationalization project. Second, we finalized and launched (trial operation) the 2MW Solar plant, that has already started to generate the expected savings as well as further contributes to the green credentials of
and service income 11.8 13.8 2.0 16.9% Sales from Municipal Solid Waste Power Plants 114.0 126.4 12.4 10.9% Sales of electricity - Base tariff and Ft 5.3 5.0 (0.3) (5.7%) Sales from Solar Energy Power
of IRPC-CP and ISP1 after start-up operation in Q4/2017 and the increase in revenue of the Combine Heat and Power Producing Company Limited (CHPP) from solar panel installation services on gas station
of IRPC-CP and ISP1 after start-up operation in Q4/2017 and the increase in revenue of the Combine Heat and Power Producing Company Limited (CHPP) from solar panel installation services on gas station
acquisition completion on 26 March 2020 and increased revenue from electricity sales of Ichinoseki Solar Power 1 GK (ISP-1) due to higher light intensity than in Q2/2019. Besides, other income of Combine Heat
million or 1% from Q3/2017, as a result of the Commercial Operation Date (COD) of IRPC-CP Phase 2 and Ichinoseki Solar Power 1 GK (ISP1) in Q4/2017 even though the selling and administrative expenses
Commercial Operation Date is expected to be within the year 2021. 1.2 The Achievement of Financial Close to Start the Construction of Collinsville Solar Power Project in Australia On May 5, 2017, RATCH