: Solar Rooftop had signed new contract of 6.5 MW in 1Q2020, total accumulated signed contract as of 1Q2020 were 36.9 MW and had started COD of 9.7 MW in 1Q2020, total operating of 16.1 MW as of 1Q2020
operates commercial solar farms in Thailand and Japan with total production capacity of 50 megawatts. The Company would like to announce the operating results for the three-month and six-month periods ended
from power plant is Baht 44.89 million, or 47.12%. By an increase of Baht 43.67 million from the Solar power plant, Kurihara 2 project in Japan which began commercial electricity distribution (COD) on 25
3,130,000 17.75 4. Mr. Thanarat Possawong 2,500,000 14.18 Total 17,630,000 100.00 At present, The Megawatt Company Limited has a plan to invest in the solar power plant with the installed capacity of 360 MWp
solar panels in area of the transmission towers, which is a new business. 1.6 Other income of 2.65 million baht, a decrease of 8.47 million baht or 76.19 percent due to the same period of the previous
main facilities have already finished and on process of transmission line and communication system. The target COD is in 1H’2019. DTE1&2 solar project (Xuan Cau Project) with an installed capacity of 420
rationalization project. Second, we finalized and launched (trial operation) the 2MW Solar plant, that has already started to generate the expected savings as well as further contributes to the green credentials of
and service income 11.8 13.8 2.0 16.9% Sales from Municipal Solid Waste Power Plants 114.0 126.4 12.4 10.9% Sales of electricity - Base tariff and Ft 5.3 5.0 (0.3) (5.7%) Sales from Solar Energy Power
Date (COD) of two phases in November 2017 and Ichinoseki Solar Power 1 GK (ISP1) started in December 2017. The share of profits of associates and joint ventures in 2018 also increased by Baht 78 million