solar panels, cutting grass, maintenance of equipment, and costs related to renewable energy project development overseas, (2) land rental for solar projects operating under SAAM, SAAM-1, SAAM-2, and SAAM
grass, maintenance of equipment, and costs related to renewable energy project development overseas, (2) land rental for solar projects operating under SAAM, SAAM-1, SAAM-2, and SAAM-3, and (3
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
addition, there was a backlog of orders at the end of the year and unrealized consignment sales (Table 3). However, sales in THB terms were affected by the appreciation of the THB against both the USD and
, inclusive of CSL’s revenue and equipment rental from partnership with TOT (see significant event). Excluding IC and equipment rental, service revenue would have been +5.7% YoY and +1.6% QoQ, against the FY18
the amount of Baht 1,948.01 million, which increased from the year 2017 by Baht 185.55 million or 10.53%. The increase was affected by an increase in the delivery volume of pre-stressed concrete piles
delivery of work is delayed in the operation of the contractor and the revenue from fuel tank rental services. 1.2 Expenses 1.2.1 Cost of services In Q2/2019, Cost of services was of Bt486.2 million
sales revenue stood at THB 877.83 million and THB 765.66 million, dropping 12.78% from declining revenue from overseas. This was a result of the delay in product delivery in China after the Company was
13.58% from the same period of previous year. This was due to decrease in the delivery of pre-stressed concrete piles, post-tensioned and special cement which was Baht 101.24 million. However, the