75.55 Expenses (81.42) (152.80) Net profit (Loss) (81.40) (77.25) Remarks: 1. As of 31 December 2017, TSEO invests in 1 solar power plant in Japan, namely Onikoube Solar Power Plant with the accredited
operation of solar projects in Vietnam DT1&2 solar projects (Xuan Cau Project) with an installed capacity of 420 MW, the largest solar project in ASEAN, commenced COD on June 3, 2019 and June 13, 2019
58.0 6.5 Solar Engergy Power Plant 58.0 54.7 55.8 1.1 (2.2) 57.1 55.2 (1.9) Gross Profit Margin by Segment 33.6 29.1 28.3 (0.8) (5.3) 33.5 28.7 (4.8) Gross Profit Margin Change Gross profit decrease 1.7
solar cell implementation service from Combine Heat and Power Producing Company Limited (CHPP) as well as the increase in maintenance cost leading to a fall in gross profit. The gross profit of the
75.2 70.8 79.5 8.7 12.3% 261.7 290.7 29.0 11.1% Solar Engergy Power Plant 2.9 2.9 2.7 2.4 (0.3) (11.1%) 9.5 10.9 1.4 14.7% Gross Profit by Segment 471.6 463.7 464.1 473.3 9.2 2.0% 1,918.9 1,872.7 (46.2
61.1 55.4 (5.7) 5.2 47.1 58.3 11.2 Solar Engergy Power Plant (15.0) 50.0 38.7 (11.3) 53.7 (28.8) 45.0 73.8 Gross Profit by Segment 33.6 35.3 35.9 0.6 2.3 31.5 35.5 4.0 Change Gross Profit Margin 6 Gross
Q3’2018 after successfully acquiring additional of 51% shares from Yanhee Solar Power. BGRIM currently holds 100% shares in BGYSP which owns and operates 59.7-MW solar power plants in the central region of
, 36 MW solar farms in Thailand have been acquired in 2016 and 2017. The revenues from renewable energy are starting to contribute a significant portion of the profits since 2018 onwards. Subsequently
closed some non-profit branches. In this regard, the closing of ELEGA branches came from the strategic to close some branches that could not generate revenue and profit as target including to reduce the
Solar Energy Public Company Limited equivalent to 74,000,000 ordinary shares at the par value of Baht 10 per share, totaling transaction value of Baht 1,695 million 2. The meeting resolved to approve the