tower, design and distribute steel structure according to the drawing, power distribution and heat energy business, construction and tunneling contractor and distribution of industrial products. In the
and changes and adjustment of the construction design, work suspension or delay due to change in construction design. Many projects are gradually completed. Concurrently, many new projects have been
from (1) and (2), it has been found that the Company still has high limitation. Hence, the Company has studied the possibility to move the location of the project to reduce the distance for raw material
Meteorology was expected that the total rainfall in the Eastern part of Thailand will be higher than average by about 15% in May, and move closing to the average level in June. The average water in the
from (1) and (2), it has been found that the Company still has high limitation. Hence, the Company has studied the possibility to move the location of the project to reduce the distance for raw material
through the acquisition of Multi Sign Company Limited (“Multi Sign”) and Comass Company Limited (“Comass”). This strategic move enabled us to jump our media coverage nationwide and gather wider audience
water quantity of the past 10 years. The weather forecast of the Department of Meteorology was expected that the total rainfall in the Eastern part of Thailand will be move closing to the average in July
projects launched, sales volume and backlog as of 31st March 2020 The sales volume in Q1/2020 is 2.62 billion THB i.e. 2.1 52.92% are ready-to-move-in projects completed before 2020 comprising 36.77
kiosks, which help people not to move far from their home area. Nevertheless, the Covid-19 pandemic can be viewed as a catalyst to accelerate the change of consumer behavior, which will result to a “New
needs a replacement to reduce the breakdown issue. KYE hires MKY to design and install the new air conditioner(MITSUBISHI ELECTRIC) which using the technology that enhances the efficiency in the test room