% Analysis of Financial Statement of Position As of 31 Dec 16 As of 31 Dec 17 Change MB % MB % MB % Cash and cash equivalents 111.0 2.7% 513.4 9.8% 402.4 362.4% Current portion of loans receivable from
% Asset from reinsurance 0 0.0% 120.8 1.4% 120.8 100.0% Current portion of loans receivable from purchase 498.7 9.5% 470.8 5.6% -27.9 -5.6% Other Current Assets 159.2 3.0% 1,024.4 12.2% 865.2 543.5% Current
Unit: Million Baht 31 March 2019 31 December 2018 Increase (decrease) % Variance Current assets 4,252 5,310 (1,058) (20%) Non-current assets 3,482 3,560 (78) (2%) Total assets 7,734 8,870 (1,136) (13
: Million Baht 30 June 2019 31 December 2018 Increase (decrease) % Variance Current assets 4,222 5,310 (1,088) (20%) Non-current assets 3,401 3,560 (159) (4%) Total assets 7,623 8,870 (1,247) (14%) Total
year by THB 18 million from decreasing of current assets THB 89 million, while the non-current assets were increased THB 71 million, which were mainly caused by: 1. Cash and cash equivalents was
2,633.9 (91.9) (3.5) Other current assets 203.7 130.6 73.1 56.0 Equipment for lease 78.5 88.7 (10.2) (11.5) Other non-current assets 67.8 77.9 (10.1) (13.0) Total Assets 6,365.6 6,429.2 (63.6) (0.1) Assets
2,633.9 (91.9) (3.5) Other current assets 203.7 130.6 73.1 56.0 Equipment for lease 78.5 88.7 (10.2) (11.5) Other non-current assets 67.8 77.9 (10.1) (13.0) Total Assets 6,365.6 6,429.2 (63.6) (0.1) Assets
with outstanding performance in terms of environment, society and governance, based on the assessment by Thai pat Institute. August World Medical Hospital received the Outstanding Cooperation Award at
the debtors and assessment of both the current and forecast general economic conditions. (in thousand Baht) Allowance for impairment losses 31 December 2019 31 March 2020 Change Consolidated financial
, respectively. Currently, the project is in the process of Environmental Impact Assessment Report preparation. 1.2 Signing of Memorandum of Understanding – “District 9 Project: Digital Industrial Zones and