Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical
principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which dialysis
contracts as Subcontractor such BangPa-Kong LNG Terminal Phase 3 project (Design, manufacture, and installation of liquid gas storage tanks) the contract value of 204.12 Million Baht, and Olefins
’ production capacity which was continued from last year resulting in an increase in loan from financial institutions and payables to suppliers of factory construction and machine installation. The increase in
of operations of the Group The Group has principally engage in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system
, mainly from net borrowing (after deducted loan repayments) of Baht 2,165 million for construction payments and the additional paid up in the capital of company’s related parties. There was the increase in
from the previous quarter has been completed and their work can be delivered such as the New Parliament Project in Information and Communication Technology, the Trading and Installation Project for the
kiosk that responded to the needs of customers. It was also a service point that facilitates the use of the service as well including the strategy of the company that focuses on managing the installation
summary as follows:- 1. Nature of operations of the Group The Group has principally engage in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water
Installation 3.49 7.92 (4.43) (55.93%) 3 - Construction 1,079.05 645.15 433.90 67.26% 4 - Testing and Inspection 57.22 61.43 (4.21) (6.85%) 5 Cost of sales and services (1,734.66) (1,473.90) 260.76 17.69% Gross