Agreements for 134 MW has been executed and lodged with the Energy Regulatory Commission (ERC) for final approval. The project targets for 85% contracted by commercial operation date. The construction of the
early 2018. - OSP energy drink market share was at 54%. Q4’18 M150 market share was at 37.9% increase by 90bps QOQ. C-Vitt took over leadership position in functional drink market, with Q4’18 market share
scheduled to be upgraded within 3 years. B.Grimm signed MOU with LGChem for the development in energy storage system and with PetroVietnam Power Corporation-JSC to jointly study and develop power plants with
. Out of the amount, sales of energy drink product alone were THB 3,247 million, up by THB 137 million or 4.4%, contributing from both domestic and overseas markets at the ratio of approximately 47:53
on track Interchem, the waste-to-energy project, with an installed capacity of 4.8 MW had 86.64% current construction progress which is on process of drainage system piping, double layer brick wall and
interest saving rate around 2.0% p.a. or Baht 119 million throughout the project life. This transaction also unleashed cash flow in the amount of Baht 84 million. Solarwa Project and TPS Commercial Project
2.4 2.6 19% 5,000 3,000 520 7mn increasing 5.3%, against t grew 420% Yo er D&A from th easing 17% from ,455mn improv her D&A and fin n increasing 7.1 in service reve 53mn increasing
for long term growth, while remaining focused on supporting, supplementing and leveraging our flagship business of Combined PET. • With the reopening of economies, easing of lockdowns and improvement in
which designs, manufactures, and installations of information and communication technology infrastructure and energy system infrastructure. The main products are Telecommunication system, Renewable energy
solidated in d of 2017, on baht or ollect more ed service c of 2016 53 r 9-months d 144.7 mill s an increa gross profi that was de period of 2 increase fr easing of g d receivable 017 ited the 3rd qua for the