the Department of Energy, Ministry of Energy, the Philippines. It is still in the process of reviewing additional documentation from the Ministry of Energy and we have not been able to conclude any
water towers are under construction. 2. Water Supply Plant Phase 1 (Thai Muang) 58% • Water production plant is under construction. • Clear water tank. In transit from England. 3. Pipeline for delivery of
tank. In transit from England. 3. Pipeline for delivery of water about 24 km fromTambon Tai Muang to Tambon Mai Khao 73% Purchase plumbing processed. Pipe laying is underway. 4. water supply and
U City Public Company Limited (Registration No. 0107537000459) 21 TST Tower Soi Choei Phuang, Viphavadi-Rangsit Road, Chomphon, Chatuchak, Bangkok 10900, Thailand T: + 662 273 8838 F: + 662 273 8858 www.ucity.co.th Ref. No. U.SET 019/2017 October 30, 2017 Subject: Entire business transfer of Unicorn Enterprise Company Limited, capital increase, issuance of the U-W3 Warrants and U-W4 Warrants, issuance and offering of the newly issued preferred shares to be issued and offered to the existing shar...
% • Water production plant is under construction. • Clear water tank. In transit from England. 3. Pipeline for delivery of water about 24 km fromTambon Tai Muang to Tambon Mai Khao 73% • Purchase plumbing
waste water created from the power plant using biomass energy According to the studies of the possibility in the investment before deciding to invest, the Company received the information that, in general
Boonchaleo Two of these tree directors jointly sign and seal of the company. World Alternative Energy Company Limited Old New Mr.Chirasak Chiyachantana Mrs.Sangsri Chiyachantana Mr.Chiraphol Chiyachantana
of the Company. Mr.Chirasak Chiyachantana Mrs.Sangsri Chiyachantana Ms.Jatechanya Boonchaleo Two of these tree directors jointly sign and seal of the company. World Alternative Energy Company Limited
31, 2030 and 2026, respectively. FPT has drawn down the loan amounting to Bt4,988.3 million - Long-term loans was of Bt10.1 million for use in Energy conservation projects. The loan will be due in
waste water created from the power plant using biomass energy According to the studies of the possibility in the investment before deciding to invest, the Company received the information that, in general