) for 2Q18 was at 4.2%, declining from 4.7% from 1Q18, ranking 8th from total 38 brokers. For products and services during 2Q18, the Bank opened the third Financial Hub at Yaowarat branch offering
percent as calculated based on the total value of consideration criterion, which gives the highest transaction value (the “Disposal Transaction”): (1) 16 plots of vacant land located on Charan Sanit Wong
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
project with 358 units and living space from 141-165 sq.m. per unit. The total project value is more than THB 1,000 mn and is located next to Centralplaza Phitsanulok, distinguished with the green area
construction, as detailed below: One combined cycle power plant, which is currently in operation, located at Si Racha District, Chon Buri Province. Cogeneration power plants with steam production unit
contracted steam capacity of 42 Ton/hour located in Eastern Seaboard Industrial Estate (“ESIE”), Pluakdaeng sub-district, Rayong province. Please be informed accordingly. Sincerely, (Mr.Wisate Chungwatana
Discussion & Analysis (MD&A) Q3/2017 Management Discussion & Analysis 99.8% 26 Project Summary : • Ichinoseki Solar Power 1GK (ISP1) is a Solar Power Plant located in Ichinoseki City, Japan with capacity of
shareholding 25.01% and 74.99% respectively, achieved COD on November 1, 2017. Gulf TS3 Power Plant had a contracted power capacity of 125 MW and a contracted steam capacity of 25 Ton/hour located in Hemaraj