in the market. As a result, the Company’s cost of raw materials cannot adjust to the market price continuously decline in time. Even though, the government has imposed the urgent measures to absorb
Thailand. E-mail: ir@aienergy.co.th บริษัท เอไอ เอนเนอร์จี จ ำกดั (มหำชน) AI Energy Public Company Limited ทะเบียนเลขที่ 0107556000311 affected from the government’s policy to adjust the biodiesel mandatory
2,728,000 2. Detail Design & Development 9,673,300 5,418,700 3,140,800 20,960,800 1. Requirement Definition 751,900 2. Detail Design & Development 3,448,900 3,290,200 1,271,800 8,762,800 1. Requirement
principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which Hemodialysis
distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which dialysis services for kidney patients
engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which Hemodialysis services
Attachment: Information Memorandum 1 Eureka Design Public Company Limited ("the Company") would like to notify the resolutions of the Board of Directors' meeting, No. 8/2020, 25th June 2020, considered and
million from telecommunication business, which is increased by Baht 335 million or 69% compared to the revenue of Baht 483 million for 2017. It results from the increase in revenue from the design and
design, work suspension or delay due to change in construction design Many projects are gradually completed. Concurrently, many new projects that have been signed into contract or about to be signed which
contracts as Subcontractor such BangPa-Kong LNG Terminal Phase 3 project (Design, manufacture, and installation of liquid gas storage tanks) the contract value of 204.12 Million Baht, and Olefins