in 2017. The project is located on Thetsaban 9 Road (opposite Sattahip Temple), Sattahip District, Chonburi Province. The total project value is 99.62 million baht. Currently, the project value
industrial waste to energy power plant project located at Ratchaburi Industrial Estate and operated by Progress Interchem (Thailand) Co., Ltd. (“Interchem”) with a contracted capacity of 4.0 MW (an installed
equivalent to Baht 3.80 million. Riau Combined-Cycle Power Plant Project is located in the Republic of Indonesia, with the production capacity of 275 megawatts and 20-year Power Purchase Agreement. The
Power Project 2 1. EXECUTIVE SUMMARY 1.1) Significant events Commercial operation of XXHP XXHP – the two hydro power projects located in Champasak province in the Lao People’s Democratic Republic - has an
and proposed to the shareholders’ meeting to approve a termination of leasehold rights on land under the title deeds no. 435 and 2847 located on Onnut–Ladkrabang Road,Ladkrabang Sub-district, Ladkrabang
and proposed to the shareholders’ meeting to approve a termination of leasehold rights on land under the title deeds no. 435 and 2847 located on Onnut–Ladkrabang Road,Ladkrabang Sub-district, Ladkrabang
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
-key hotel under Vienna House Easy brand located in Wroclaw, Poland. Vienna House Easy Wroclaw is expected to open in 2021. 24 May 2019: Signed the amendment to the agreement in relation to Roi Chak Sam
generation capacity of 29.70 megawatts. It is located in Ben Tre Province in the south of the Socialist Republic of Vietnam. The project has 20-year PPA with Vietnam Electricity. The project cost is
Energy Services Co.,Ltd. (Paju ES) (EGCO holds a 49.00% ownership interest), located in Gangdong-gu, Seoul, South Korea with a capacity of 19.80 MW. Gangdong will sell electricity to Korea Electric Power