Natural FA could be competitive to Synthetic FA. Moreover, Natural FA supply was relatively tight as Brazil producer and many Chinese producers have reduced their production, since they were affected by the
8.6 MW Waste to Energy Power Plant, representing 2.9 Equity MW, is scheduled to achieve COD in 4Q2019. Power plant Type of power Category of producer Equity holding (%) Installed Capacity (MW) Equity
producer Equity holding (%) Contracted Capacity (MW) Equity Capacity (MW) Commercial Operation Date Gulf NLL2 Gas-fired Cogeneration SPP 25.01 120.0 30.0 Jan 2019 CCE Waste to Energy VSPP 33.33 6.9 2.3
Limited, the Company’s direct subsidiary, holds 40 percent stake), the operator of a small power producer in Nava Nakorn Industrial Promotion Zone, invested in an expansion for an addition of 60 megawatts
to achieve COD in 4Q2019. Power plant Type of power Category of producer Equity holding (%) Installed Capacity (MW) Equity Capacity (MW) Commercial Operation Date Solar Rooftop Solar Private PPA 100
Rooftop had signed new 6.5 MW, total accumulated capacity in pipe line are 20.4 MW which are under construction and scheduled to achieve COD in 2Q2020-4Q2020. Power plant Type of power Category of producer
which are under construction and scheduled to achieve COD in 1Q2020-3Q2020. Power plant Type of power Category of producer Equity holding (%) Installed Capacity (MW) Equity Capacity (MW) Commercial
pipeline are 26.7 MW which are under construction and scheduled to achieve COD in 3Q2020-1Q2021. Power plant Type of power Category of producer Equity holding (%) Installed Capacity (MW) Equity Capacity (MW
maintain production cost as low as possible. Due to the decrease in sales volume, the Company is considering providing the manufacturing service to biodiesel producer customer again in the next quarter
cost as low as possible. The Company is considering providing the manufacturing service to biodiesel producer customer again. Selling Expenses The Company and its subsidiaries’ selling expense mostly