1.6% 24,971 25,340 -1.5% Total revenues from sales 6,333 6,364 -0.5% 24,297 25,027 -2.9% Beverages 4,690 4,829 -2.9% 18,575 18,975 -2.1% Personal Care 675 611 10.4% 2,452 2,195 11.7% Supply Chain
626.8 -4.8% 1,776.7 1,584.1 12.2% Supply Chain Services 855.5 812.4 5.3% 2,151.6 2,785.4 -22.8% Other Segments 50.5 53.4 -5.4% 150.6 146.9 2.6% Total other income 161.2 54.7 194.9% 487.3 259.9 87.5% Gross
was impacted from increase in methyl ester supply in Thailand which pressured to the profitability of methyl ester, Stock Loss & NRV due to dropped in crude palm oil price, and the declining of
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
; 2.) ESCENT PARK VILLE Chiangmai currently has 50% pre-sales take up, will be completed and ready for transfer by 2020 and 3.) NIYHAM Boromratchachonnani, a single-detached housing project located on
- Sales and service of water supply 138.99 97.73 42.22 - Installation of water production systems and construction of turnkey water treatment systems 46.96 102.71 (54.28) WIIK PUBLIC
supply due to low Biodiesel production in Indonesia. 2. In Q2 2017, Selling and Administrative Expenses was 339 MB, increased by 54 MB or 19.1% comparing to 2016 due to related expenses of the transitional