rendering of related services to the group customer, with 17 operating solar power projects in Thailand, and (2) revenue from the sale of electricity from its own solar power project operated by its direct
clients who operate 17 solar power projects in Thailand, and (2) revenues from the sale of electricity from its own solar power project operated by its direct subsidiary. SAAM Energy Development Public
and net loss of THB 317.93 million primarily due to: • THB 233.38 million of loss from Power Plant Business (which has been disposed since Q3-2020) • THB 45.43 million of impairment of assets in parent
ended 31 December 2018 The progress of 2 ongoing investment projects are as follows: 1. Water Supply Investment Project for Chiang Mai Municipality: It is the Build Own and Operate (BOO) one with asset
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
same period last year, comes from the decrease in revenue from both of electricity generating project. The decrease in revenue of the hydro-power project is caused by the drought in November and December
Investing in Industrial Estate and Power Plant Businesses, Connected Transactions, Election of New Director, Issuance and Offering of Debentures, and Convening of 2021 AGM (Amended) 10/03/2021 06:30 Omission