are engineering, construction,and installation of electrical and control systems. The Company has also been providing operation and maintenance services to offshore and onshore https://market.sec.or.th
. Currently, the construction of the factory building, and machine installation has been partially completed. Anywise, the company had to repay loans and interest regularly. 7. The performance of the company
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
installation capacity 7.5 MW of Prize of Wood Green Energy at Narathiwas Province which this project is held 99.99 percent of total shares by SAFE. The Company could gain profit sharing from the 1st Quarter 2018
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
? shares, construction contracts, machinery procurement and installation contracts, as well as misuse of NE and ESES whose controlling person was Bhusana as a channel for committing fraudulent acts in many
of operations of the Group The Group has principally engage in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system
Net Tangible Asset (NTA), and is not a related transaction and that the size of the transaction does not require us to disclose the information in accordance with the disclosure rule for acquisition and
% of company’s Net Tangible Asset (NTA), and is not a related transaction and that the size of the transaction does not require us to disclose the information in accordance with the disclosure rule for
Rule (NCR) 18/09/2540