grass, maintenance of equipment, and costs related to renewable energy project development overseas, (2) land rental for solar projects operating under SAAM, SAAM-1, SAAM-2, and SAAM-3, and (3
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
, inclusive of CSL’s revenue and equipment rental from partnership with TOT (see significant event). Excluding IC and equipment rental, service revenue would have been +5.7% YoY and +1.6% QoQ, against the FY18
, entered into an Agreement with Cherdchaiwon Company Limited which is the Company’s related party in order to build a Specific Hydraulic Platform with its equipment and system and to produce a structural
had to pay for the excess amount of water drawn from Bangpra that exceeded the quota permitted through an agreement with Royal Irrigation Department during the drought by 27.74 million Baht 6. Tap Water
, plant and equipment 522.38 519.55 2.83 0.54% Goodwill 19.38 19.38 0.00 0.00% Intangible assets 4.44 7.16 (2.72) (37.99%) Deferred income tax assets 3.88 4.14 (0.26) (6.28%) Other non-current assets 18.61
equipment 520.8 519.55 1.25 0.24% Goodwill 19.38 19.38 0 0.00% Intangible assets 7.14 7.16 (0.02) (0.28%) Deferred income tax assets 3.99 4.14 (0.15) (3.62%) Other non-current assets 23.2 26.12 (2.92) (11.18
(9.26) (13.75%) Investment properties 99.26 4.52 94.74 2096.02% Property, plant and equipment 520.8 519.55 1.25 0.24% Goodwill 19.38 19.38 0 0.00% Intangible assets 7.14 7.16 (0.02) (0.28%) Deferred
0.06 4.18 0.05 Animals and plants - net 522.68 10.46 554.37 9.32 501.95 7.11 475.91 5.95 Property, plant and equipment - net 3,681.42 73.63 4,726.71 79.46 6,140.87 86.96 7,227.80 90.40 Advances for