29% as compared to the end of the year 2017 of 30,161 million Baht. The main liabilities included: short-term loans from financial institutions of 2,976 million Baht, current portion of long-term loans
have played key role in acquiring new subscribers and providing services to existing customers. Prepaid segment continued its acquisition momentum with net addition of 134k while postpaid segment
Mandate of Baht 888,443,440.00 from the existing registered capital of Baht 2,221,108,600.00 to the new registered capital of Baht 3,109,552,040.00 by issuing and allocating not more than 888,443,440.00 new
to approve the capital increase by the General Mandate of Baht 888,443,440.00 from the existing registered capital of Baht 2,221,108,600.00 to the new registered capital of Baht 3,109,552,040.00 by
on track Interchem, the waste-to-energy project, with an installed capacity of 4.8 MW had 86.64% current construction progress which is on process of drainage system piping, double layer brick wall and
with sustainable growth. Projects under construction are on track Interchem, the waste-to-energy project, with an installed capacity of 4.8 MW had 50.7% current construction progress which is on process
registered capital from the existing registered capital of Baht 2,896,834,342 to Baht 2,348,135,754 by cancelling 548,698,588 shares at a par value of Baht 1.00 per share. As such shares are the remaining
registered capital from the existing registered capital of Baht 2,896,834,342 to Baht 2,348,135,754 by cancelling 548,698,588 shares at a par value of Baht 1.00 per share. As such shares are the remaining
approximately Baht 745.9 Million (excluding VAT); 3. Improvement and replacement of the expiring equipment in the E&M Systems in respect of the existing MRT Blue Line Project had the value of approximately Baht
Project had the value of approximately Baht 745.9 Million (excluding VAT); 3. Improvement and replacement of the expiring equipment in the E&M Systems in respect of the existing MRT Blue Line Project had