October 2017 Subject: Notification of the Board of Directors No. 9/2017 on the Company Investment in SUT Hydro Company Limited To: The President The Stock Exchange of Thailand Pursuant Following Hydrotek
same period last year, comes from the decrease in revenue from both of electricity generating project. The decrease in revenue of the hydro-power project is caused by the drought in November and December
-2 Ranking HYDRO บริษัท ไฮโดรเท็ค จำกัด (มหาชน) Filing งบการเงิน 56-1 56-2 Ranking ปรับปรุงล่าสุด 13 มกราคม 2568
145 353.1% 281.6% Sales to EVN - 886 n/a - 183 703 n/a 284.2% Electricity sales 25,668 31,844 24.1% 9,370 10,453 11,438 22.1% 9.4% Steam sales 408 700 71.6% 143 218 289 102.1% 32.6% Demin Water - 26 n/a
. Lao PDR’s installed capacity is approximately 8,800 megawatts. Because of its abundant water resource and mountainous geography, the electricity generation is mainly from hydropower plants. With an aim
Company during periods of low electricity demands. 4. Hydro Power Plant project in Laos recorded lower total electricity sales by 47% QoQ, mainly from a drop in water content due to an off-season period and
) 2 % หลัง ได้มา/ จำหน่าย (กลุ่ม) 2 หมายเหตุ 3 PDF หมายเลข HYDRO นาย สลิบ สูงสว่าง จำหน่าย หุ้น 5.0038 0.4659 4.5379 06/09/2564 5.0038 0.4659 4.5379 246013132109-1 หุ้น หมายถึง หุ้นสามัญหรือหุ้น
Xayaburi Power Company Limited, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA