Exchange Commission No. Kor Thor. 9/2556 Re: Segregation and Management of Client’s Assets In Case of Intermediary Being under Receivership by Court Order _____________________________ By virtue of Section 9
Exchange Commission No. Kor Thor. 9/2556 Re: Segregation and Management of Client’s Assets In Case of Intermediary Being under Receivership by Court Order _____________________________ By virtue of Section 9
Exchange Commission No. Kor Thor. 9/2556 Re: Segregation and Management of Client’s Assets In Case of Intermediary Being under Receivership by Court Order _____________________________ By virtue of Section 9
Business News ( 2 record(s) found) Date Time Heading Link 09/04/2019 17:53 Information Memorandum on the Disposal of Assets (Edit) 04/04/2019 18:49 Information Memorandum on the Disposal of Assets Remark
signed new 4.0 MW, total accumulated capacity in pipe line are 24.4 MW which are under construction and scheduled to achieve COD in 1Q2020-3Q2020. Power plant Type of power Category of producer Equity
8.6 MW Waste to Energy Power Plant, representing 2.9 Equity MW, is scheduled to achieve COD in 4Q2019. Power plant Type of power Category of producer Equity holding (%) Installed Capacity (MW) Equity
producer Equity holding (%) Contracted Capacity (MW) Equity Capacity (MW) Commercial Operation Date Gulf NLL2 Gas-fired Cogeneration SPP 25.01 120.0 30.0 Jan 2019 CCE Waste to Energy VSPP 33.33 6.9 2.3
to achieve COD in 4Q2019. Power plant Type of power Category of producer Equity holding (%) Installed Capacity (MW) Equity Capacity (MW) Commercial Operation Date Solar Rooftop Solar Private PPA 100
contribution of Baht 1.4 million in 1Q2019. 6 4. FINANCIAL POSITION The Consolidated Balance Sheet as of 31 March 2020 is summarized as follows. Assets As of 31 March 2020, the Company’s total Assets was Baht
which are under construction and scheduled to achieve COD in 1Q2020-3Q2020. Power plant Type of power Category of producer Equity holding (%) Installed Capacity (MW) Equity Capacity (MW) Commercial