901m which was 8% higher than Q3 2016 was THB 834m. Capital Expenditure Capital Expenditure was THB 302m in Q3 2017, and THB 242m in Q3 2016. Generally, capital expenditure for production equipment will
Cost 96.5 4.3% 243.9 9.8% 147.4 152.8% Investment Properties 507.3 22.4% 520.4 20.8% 13.1 2.6% Land and Equipment 126.6 5.6% 151.7 6.1% 25.1 19.8% Leasehold rights and buildings 1,260.9 55.7% 1,330.8
Properties 507.3 22.4% 520.4 20.8% 13.1 2.6% Land and Equipment 126.6 5.6% 151.7 6.1% 25.1 19.8% Leasehold rights and buildings 1,260.9 55.7% 1,330.8 53.3% 69.9 5.5% Deposits 134.1 5.9% 136.8 5.5% 2.7 2.0
Rapid Transit Authority of Thailand (“MRTA”) under the MRT Blue Line Concession Agreement on March 31, 2017, under which the Company has the duties to design, supply, install, test the M&E Equipment, and
duties to design, supply, install, test the M&E Equipment, and trial run, as well as to provide the O&M services for the civil infrastructure (except for the park and ride building) and M&E Systems, which
equipment rental, while SG&A was flat and dropped QoQ as marketing activities slowed down. EBITDA (pre-TFRS16) was Bt19,576mn, increased 3.8% YoY and 1.1% QoQ with a margin of 45.7%. Net profit (pre- TFRS16
companies with an increase in property, plant and equipment by 10.35 million bath due to the investment in machinery of new production lines. 2. Total liability, the company had total liability as of December
for the period Particle Planner Co., Ltd. buy machine and equipment from Vanachai Veneer and Plywood Co., Ltd. 13 Nov. 2018 20,250,000 0.26% as at 30 Sep. 2018 Total 20,250,000 0.26% - 3 - 6.2.3 Normal
12.4% 45.2 17.3% Investment Property 130.8 5.4% 124.3 5.1% -6.5 -5.0% Equipment 518.8 21.5% 518.8 21.1% 0.0 0.0% Leasehold rights and buildings 1,284.4 53.3% 1,293.1 52.6% 8.7 0.7% Advance for
in an increase in fixed deposits as collateral, Baht 439.14 million in an increase of land, building and equipment and the increase in Baht 106.51 million in goodwill of from the acquisition of a