day. Capacity (m3/day) 2,000-2,200 m3/day Construction Period Within Quarter 4/2018 Scheduled Commercial Operation Date Within Quarter 1/2019 Expected Capital Expenditure THB 40-60 mn Project Risk HSMC
day. Capacity (m3/day) 2,000-2,200 m3/day Construction Period Within Quarter 4/2018 Scheduled Commercial Operation Date Within Quarter 1/2019 Expected Capital Expenditure THB 40-60 mn Project Risk HSMC
year such as manufacturing (number of factories, total production capacity), acquisition of raw materials or products for sale, number of raw material distributors, proportions of domestic and overseas
preceding year such as manufacturing (number of factories, total production capacity), acquisition of raw materials or products for sale, number of raw material distributors, proportions of domestic and
, respectively. Private investment slowed to 2.8 percent from 4.1 percent in 2018 while manufacturing production declined 3.7 percent, in line with a low capacity utilization rate of 66.3 percent, below the five
Company’s capability to compete in an auction that require high experienced engineering. The Company views that SUTGH’s shareholders are strategic investors; will bring their knowledge and expertise in
unable to operate at its full capacity. Selling Expenses Selling expenses for the fiscal year 2018 were in the amount of Baht 75.20 million which increased by Baht 4.25 million or 5.99% from the previous
well as new customers, which resulted in additional revenue for the group. For the Company, the installation of new machines throughout the year 2016 increased production capacity for existing products
shareholding 25.01% and 74.99% respectively, achieved COD on November 1, 2017 with a total contracted capacity of 125.0 MW, increasing our Equity MW under Operation further to 478.4 MW. The company recently
lowered, and the cancellation of the reclassification of fixed costs at the new factory had incurred as a result of lower-than-normal production capacity to administrative expenses. Consequently, the