. Saran Lertcharoenwongsa, the land procurement coordinator and financial manager, jointly approved the purchase of land for the construction of a waste-to-energy biomass power plant and plastic recycling
, and Mr. Saran Lertcharoenwongsa, the land procurement coordinator and financial manager, jointly approved the purchase of land for the construction of a waste-to-energy biomass power plant and plastic
LIMITED FINE METAL TECHNOLOGIES PUBLIC COMPANY LIMITED FIRETRADE ENGINEERING PUBLIC COMPANY LIMITED FLOYD PUBLIC COMPANY LIMITED FN FACTORY OUTLET PUBLIC COMPANY LIMITED FNS HOLDINGS PUBLIC COMPANY LIMITED
/201911/19104563.pdf 18057832.pdf electrical generating capacity; 4.1.2 HHPC hydroelectric IPP plant located in Attapeu province, Laos PDR with 152 MW of electrical generating capacity; 4.1.3 GHECO-One
and garlic prices and an increase in selling price. Moreover, in 1H17, there was the duplicated cost of labor between two factories at Laem Chabang and the new factory at Amata City provided that such
%) 751.4 680.5 (9.4%) Sales of electricity to Industrial Users (IU) 1.3 1.1 1.4 27.3% 7.7% 2.9 2.5 (13.8%) Sales of steam (IU) 4.4 2.5 2.9 16.0% (34.1%) 9.3 5.4 (41.9%) Sales from Natural Gas Power Plant
1.9 0.8 72.7% 13.3 8.4 (4.9) (36.8%) Sales from Natural Gas Power Plant 422.3 466.9 507.7 568.3 60.6 11.9% 1,814.5 1,965.2 150.7 8.3% Sales of electricity - FiT, base tariff and Ft 70.1 72.2 59.5 74.1
17.36% down from 2017 due to higher operating expense from new further processing factory which was not reach target utilization in the first half of 2018. Financial Cost Financial costs of the group
higher production capacity of cooked chicken products from new further processing factory. Furthermore, GFN’s profit contribution was THB 2.51 million, increased by THB 73.49 million or 103.54% up
current assets, THB 7,850.71 million (46.69% of total assets) in property, plant and equipment (PP&E), THB 2,654.67 million (15.79% of total assets), in investments in associated companies, THB 462.42