Significant Event Focus on Developing and Expanding Luggaw and Mikka café The Company plans to open an additional 5 “Luggaw” branches during 2H/2024. In Q2/2024, the Company expanded 4 new Luggaw café, located
Branch in Phnom Penh In October 2024, the Company opened its first After You dessert Café in Cambodia, located in Phnom Penh, which was well-received by customers. The Company continues to seek for new
% ownership interest.), is a hydro power plant project, Run-of-River, with the capacity of 1,285 MW. The project is located on the Mekong River in Xayaburi Province of the Laos People’s Democratic Republic
Company Limited (BIC) Phase 2 is a gas-fired SPP Cogeneration, located in Bangpa-In Industrial Estate, Phra Nakhon Si Ayutthaya Province, with capacity of 117 megawatts of electricity and 20 tonnes per hour
% ownership interest.), is a cogeneration power plant project. The power plant has an installed capacity of 121 MW. The project is located in Klongnueng sub-district, Klonglaung district, Pathumthani province
percent as calculated based on the total value of consideration criterion, which gives the highest transaction value (the “Disposal Transaction”): (1) 16 plots of vacant land located on Charan Sanit Wong
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
project with 358 units and living space from 141-165 sq.m. per unit. The total project value is more than THB 1,000 mn and is located next to Centralplaza Phitsanulok, distinguished with the green area